Space Telescope Science Institute   8.10 Calibration Plan Summary  8.11.1 Internal Monitors

8.11 Cycle 4 Calibration Plan


The primary goal of the Cycle 4 calibration plan was to provide an instrument calibration for Cycle 4 GO and GTO science programs as well as monitor internal health, photometric and optical stability of the instrument. This report briefly summarizes the WFPC2 calibration proposals as they were implemented during Cycle 4. Table 8.4 outlines the proposal contents as well as the approximate frequency of execution while the following section presents more details of the justification and intent for each proposal.

Table 8.4: Summary of Cycle 4 Calibration Plans.
ID
Title
Frequency
notes
Internals
5568
Decontaminations
1 x month
internals plus decon itself
5560
Internal Monitor 1.
2 x week
intflats, biases, kspots
5561
5655
Internal Monitor 2. - Flats
~2 x month
darks, visflats. UVflats suspended after June 12; one set of uvflats run as a test (Oct. 1994)
5562
Internal Monitor 3. - Darks
5 per week
serials=ON taken in 5561/5655
5569
5764
Internal Flats
once

intflats & visflats, in variety of filters

6140
Ramps: Internals & Earthcals
once
internals to aid in LRF calibration
Photometry
5563
Photometric Monitor - UV Std.
2 x month
GRW+70D5824, std.filters. Clocks OFF except Dec. 1994, 1994 (ON).
5565
5663
Photometric Monitor - Fields
2 x month
Usually NGC5139. Clocks OFF except Dec. 1994 (ON).
5629
Photometric Monitor - Four Chip Std.
1 x week
GRW+70D5824; 4 CCDs, F170W
5572
Photometric Filter Calibration

run twice during Cycle 4
GRW+70D5824 in all filters used by GO/GTOs during Cycle 4; NGC5139 done in subset of broadbands.
5646
CTE Dither Test
run once
Omega Cen, nine 40 sec images in F555W, offset in 15" steps
5659
CTE Dither Test - Part 2

run once
same as 5646 but in F439W, F814W
5564
Photometric Calibration: 4-CCD
to be run once
GRW+70D5824, in 4 CCDs, standard broadband filters
Earth Flats
5570
Earth flats - Large Set
~ 40 per week
200 Earthflats in each of four filters: F375N, F502N, F656N and F953N
5571
Earth flats - Small Set
~14-20 per week
20 Earthflats in each of ~20 filters
Other
5643
Partially Rotated Filters
done once
GRW+70D5824 & visflats, FQUVN, FQCH4N and partial rotations
5632
Preflash Test
done twice
Omega Cen in broadband filters; includes preflash done with intflat; replaced 5565 during Apr. 1994
5778
Lyman Alpha Throughput Check
do twice
target: BD+75D325
5573
Ramp Calibration


5574
Polarization Calibration
done once
G191B2B, BD+64D106, RMon, NGC 4147, and visflats
Placeholders/Contingency (no plans to execute, may not be run at all)
5627
Photometric Monitor 1a: Std. in UV

Not needed.
5628
Photometric Monitor 1b: Std. in Vis.

Not needed.
5645
Optimum Preflash Test

Not needed.
5648
Charge Transfer Test

Withdrawn.
5566
5567
UV Campaign Photometry
UV Campaign Flats

Not needed; no UV campaigns run
5575
Dither Test

Not needed.