|
The deadline for proposal submission is Friday 26 January 2007, 8:00 pm EST. |
Please submit well before the deadline if possible, to avoid possible last-minute hardware or overloading problems, or network delays/outages. Late proposals will not be considered.
Questions about policies and technical issues should be addressed to the STScI Help Desk (see Section 1.5) well before the deadline. While we attempt to answer all questions as rapidly as possible, we cannot guarantee a speedy response in the last week before the deadline.
Cycle 16 proposals must be submitted electronically. Starting in Cycle 12, a java-based software tool, APT (the Astronomer's Proposal Tool; see Section 1.4.6) is the new interface for all Phase I and Phase II proposal submissions for HST.
|
The Phase I LaTeX templates that have been in use for many years will not be accepted in Cycle 16. |
A Phase I proposal consists of two parts:
Both are submitted to STScI directly from within APT. Note that Student Principal Investigators should also arrange for a certification letter to be sent by their faculty advisor (see Section 2.3.3).
Please study Chapter 7, Chapter 8 and Chapter 9 carefully. Please do so well before the submission deadline, to give the STScI Help Desk (see Section 1.5) ample time to answer any questions that you may have about the new procedures.
There are page limits on the size of your PDF attachment. Table 7.1 outlines these limits for different proposal categories.
Proposal Category |
Reference Section in CP |
Total Page Limit for PDF Attachment |
Page Limit for the Scientific Justification ( Section 9.1) |
---|---|---|---|
Regular GO1 |
8 |
3 |
|
Large GO2 |
11 |
6 |
|
Treasury GO |
11 |
6 |
|
Survey |
8 |
3 |
|
Snapshot |
8 |
3 |
|
Theory |
8 |
3 |
|
Regular AR3 |
8 |
3 |
|
Legacy AR |
11 |
6 |
1Regular GO proposals include Calibration GO programs ( Section 3.2.4), Joint HST/Chandra ( Section 3.5), Joint HST-NOAO proposals ( Section 3.6) and Regular HST/Spitzer Proposals ( Section 3.7.1). 2Coordinated HST/Spitzer proposals ( Section 3.7.2) have the same page limits as Large GO proposals. 3Regular AR proposals include Calibration AR programs ( Section 3.4.3). |
In relation to these page limits, note the following:
Space Telescope Science Institute http://www.stsci.edu Voice: (410) 338-1082 help@stsci.edu |