| Cosmic Origins Spectrograph Instrument Handbook for Cycle 17 | ||||
|
|
9.3 Spectral Element Movement Overheads
For any COS exposure, including target acquisition exposures, an overhead must be included to allow for the time required for any change of spectral elements. Note that a transition from FUV to NUV may require both OSM1 and OSM2 to be moved as this transition requires movement of OSM1 to the NCM1 position, followed by a possible OSM2 movement. On the other hand, a transition from NUV to FUV requires only the movement of OSM1 from NCM1 to the desired FUV grating. Table 9.3 gives the times required for movement between all OSM1 spectral elements and Table 9.5 gives the times for movement between OSM2 spectral elements.
As there are setup overheads associated with moving and seating the COS OSM assemblies, you must add 60 seconds to the values in Table 9.3 and Table 9.5 to obtain the complete overhead required for the movement.
Note that all COS visits start with OSM1 at the G130M position and OSM2 at the G185M position.
Table 9.3:
Table 9.4:
Movement times (sec)1 to G140L to G130M to G160M to NCM1from G140L from G130M from G160M from NCM1
1Add 60 sec to each indicated time to get the total time needed.
Overhead Times for Motions Between OSM1 Spectral Elements
Table 9.5: Overhead Times for Motions Between OSM2 Spectral Elements
Table 9.6:
Movement times (sec)1 to G230L to G185M to G225M to G285M to MIRRORA to MIRRORBfrom G230L from G185M from G225M from G285M from MIRRORA from MIRRORB
1Add 60 sec to each indicated time to get the total time needed.
|
Space Telescope Science Institute http://www.stsci.edu Voice: (410) 338-1082 help@stsci.edu |