STScI

Phase 2 Proposal Instructions for Cycle 10

TOC PREV NEXT INDEX


4.1 Target Number [Target_Number]


Each target that will be observed must be assigned a unique target number. Target numbers must be positive, monotonically increasing (but not necessarily consecutive) integers. A different target should be defined whenever a different target position or timing description is required. For example, separate targets should be defined if you plan to take spectra of several different surface features on a planet, or if you plan to observe the same feature with different timing constraints.

If more than one type of Target List is used (if your program also requires filling out the Fixed Target List or the Generic Target List), the target numbers should continue consecutively from one list to the next. All target numbers within a proposal must be unique.



Space Telescope Science Institute
http://www.stsci.edu
Voice: (410) 338-1082
help@stsci.edu
TOC PREV NEXT INDEX