No action is required by the proposer at this time. For Cycle 16 the Phase will automatically be set to 'Phase I'. See Section 2.1 for a description of the different phases in the HST proposal process.
Space Telescope Science Institute http://www.stsci.edu Voice: (410) 338-1082 help@stsci.edu |