After Technical Review, observations determined to be feasible are scheduled for execution. The scheduling process attempts to optimize the overall HST efficiency. STScI will not contemplate requests to advance or postpone the scheduling of individual programs based on other considerations, with the possible exception of compelling scientific arguments.

10.6.1 Unschedulable or Infeasible Programs

Proposers should be aware that after acceptance of a proposal, the actual execution of the observations may in some cases prove impossible. Possible reasons include:

Note also that the STScI Director reserves the right to disallow at any time any or all observations of an approved program if it is demonstrated that incorrect or incomplete information was provided in the Phase I proposal that may have significantly influenced the approval recommendation by the Review Panels or TAC.


 10.5 Technical Review  10.7 Access to Data Products
Space Telescope Science Institute
http://www.stsci.edu
Voice: (410) 338-1082
help@stsci.edu