Space Telescope Science Institute   9.3 Special Requirements  9.5 Justify Duplications

9.4 Coordinated Observations


(This item is required only for GO proposals)

If you have plans for conducting coordinated observations with other facilities that affect the HST scheduling, please describe them here (examples are coordinated or simultaneous observations with other spacecraft or ground-based observatories). Describe how the observations will affect the scheduling.

If you have plans for supporting observations that do not affect HST scheduling, then don't describe them here. If they improve your science case, then describe them in the 'Scientific Justification' section of the proposal (see Section 9.1).

A limited feasibility check on coordinated observations between HST and a few other observatories (Chandra, XTE, and FUSE) may be performed via the Visual Observation Layout Tool (VOLT), developed at the Goddard Space Flight Center. See the VOLT web site for more information. Note that VOLT cannot be used for detailed (Phase II) scheduling of HST observations.

9.4.1 Joint HST-Chandra Observations

Proposers requesting joint HST-Chandra observations (see Section 3.7) must provide a full and comprehensive technical justification for the Chandra portion of their program. This justification must include:

Technical documentation about Chandra is available from the Chandra X-ray Center (CXC) Web Page, which also provides access to the Chandra Help Desk. The primary document is the Proposer's Observatory Guide, available from the Chandra User Documents Web Page and the Chandra Proposer Web Page. Full specification of approved observations will be requested during the Chandra Cycle 6 period when detailed feasibility checks will be made.

Proposers requesting joint HST-Chandra observations must specify whether they were awarded Chandra time in a previous Chandra or HST cycle for similar or related observations.

9.4.2 Joint HST-NOAO Observations

Proposers requesting joint HST-NOAO observations (see Section 3.8) must provide a full and comprehensive technical justification for the NOAO portion of their program. This justification must include:

Successful proposers will be asked to supply additional details about the observations, i.e., the same details required for NOAO proposals for the particular telescope/instrument. This "Phase II - NOAO" information must be submitted by the April 30, 2004 NOAO deadline for the Fall 2004 semester. Submission instructions will be forthcoming following notification of the results of the HST review.

Technical documentation about the NOAO facilities is available from the NOAO Web Page. Questions may be directed to the NOAO Proposal Help Desk by email to noaoprop-help@noao.edu. NOAO will perform feasibility checks on any approved proposals.

Proposers requesting joint HST-NOAO observations must specify whether they were recently (in the last two years) awarded NOAO time for similar or related observations.

A full and comprehensive scientific justification for the requested NOAO observing time and facilities must be given in the 'Scientific Justification' section of the proposal (see Section 9.1).


 9.3 Special Requirements  9.5 Justify Duplications
Space Telescope Science Institute
http://www.stsci.edu
Voice: (410) 338-1082
help@stsci.edu